If serious problems occur on site, immediate actions undertaken by an architect might include:
- Stop the work
- Ensure that the contractor has notified the employer
- Ensure that the contractor does not repair/do any work until the insurers/survey have/is carried out their investigation
- Notify the CDM co-ordinator
- Instruct the structural engineer to carry out a structural report
- Assess measures to be taken to restore the site to a safe condition
- Ask the quantity surveyor to go to site and value the damages
- Ensure that the contractor has disclosed all of the facts to the insurer
Contractual situation 1: Example - collapsed wall
- A full investigation must be carried out to determine who’s fault it was (eg design fault / contractors fault / specified peril such as a flood)
- Contact professional indemnity insurer to notify them of a circumstance that may lead to a claim
- Advise other consultants to do the same
- If the damage was caused by a specified peril, it will be covered by works insurance
- If it was a design fault, will be covered by PI insurance
Contractual situation 2: example - a fire
- The contractor will restore the damaged work, restore and repair any site materials damaged and proceed with carrying out the completion of the works
- The restoration of the loss or damage shall be treated as if it were a variation required by an architects instruction
- The contractor may be entitled to an extension of time and loss and/or expense
Contractual situation 3: example - archaeological items found
- All items found on site are the property of the employer
- The architect should contact the archaeology department of the borough or county council to inform them of the discovery and ask for advise.
- The architect shall issue instruction as to what is to be done, which may require that the contractor permit the examination, excavation and removal of the items by a third party
- The architect shall ascertain any entitlement the contractor has to loss and/or expense
[edit] Related articles on Designing Buildings Wiki
- Code of construction practice.
- Complaining about construction sites.
- Considerate Constructors Scheme.
- Damage caused by construction works.
- Environmental health.
- Environmental impact assessment.
- Health and safety inspector.
- Noise nuisance.
- Nuisance in construction.
- Quiet period.
- Site inspections.
- Site rules.
- What hours are construction sites allowed to operate?
Featured articles and news
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.